Procurement diagram, not a claimed plant pin
Refrigeration Compressor Sourcing
Refrigeration Compressor Sourcing is an independent sourcing partner. Use this page to send compressor duty, quantity, destination and timing. Street address, telephone and map pins are not published because brand_config.contacts is empty; we do not invent a showroom. The illustration above is a process diagram, not a claimed factory location. Hours for this desk follow the inquiry queue rather than a published shop-floor roster. We do not list a social-media handle or a walk-in engine room.
- Equipment and process: refrigerant, evaporating and condensing temperatures, screw or reciprocating architecture, required control range, and for CO2 the dedicated pressure envelope plus oil-management arrangement.
- Quantity and destination: compressor count, spare oil-filter kits, US state or country, Incoterms if already chosen, and the delivery window.
- Utilities and delivery window: three-phase supply, cooling water or oil cooling, footprint, PLC interface, FAT/SAT expectations and requested lead time.
- Write the refrigerant, evaporating and condensing conditions, architecture and whether the quoted number is capacity or displacement.
- State quantity, destination and timing; add optional budget and supplier preference if you have them.
- We align those assumptions across bidders and return comparable factory replies. Drawings can follow by email; this form has no upload field.
After you submit, we clarify the brief and request factory wholesale quotes. No existing supplier quotation is required. Optional budget (currency and per-unit or whole-order basis) and supplier preference travel with the same requirement field. Preference is a commercial taste, not a rating we verified. We will not treat this form as a purchase order, a FAT signature or an installed-cost commitment. If you already have a refrigeration compressor manufacturers document, attach nothing here; paste the assumptions you want restated so we can see whether evaporating temperatures, condensing temperatures, kW duty and destination match the new request. Connected load, three-phase supply, cooling water and footprint still belong in the requirement box even when a budget range is attached.